|
|
Marine Operations Specialty Symposium (MOSS 2008)
Editor(s): Yoo Sang CHOO1 and David N. EDELSON2
1Center for Offshore Research & Engineering (CORE), National University of Singapore, Singapore
2Marine Operations & Floatover for the Topsides & Fixed Platforms Department, Technip, USA
Table of Contents
Lessons Learnt and Codes

| Topsy Turvy Twelve Pile Launches Peter Marshall
|

| Updated DNV Codes for Marine Operations Per Øystein Alvær
|
Simulation of Operations

| Simulation of 'Ormen Lange' Installation Operations Peter C. Sandvik and Svein-Arne Reinholdtsen
|

| Model Tests and Computer Simulations for Njord FPU Gas Module Installation Remmelt van der Wal, Hans Cozijn and Chris Dunlop
|

| Anchor Handling Simulation Noël Bovens and Brian Townsley
|

| Human Element in the Safety Modeling of Offshore Marine Operations Haibo Chen and Torgeir Moan
|
Transportation

| Heavy-Lift Transport Ships – Overview of Existing Fleet and Future Developments Frank van Hoorn
|

| A New Approach to Designing and Approving Barge Tows James Vavasour, Doug Devoy, Trevor Mills and Albert B. Aalbers
|
Hydrodynamics and Lifting Operations

| First and Second Order Wave Effects in Narrow Gaps Between Moored Vessels Liang Sun, Paul H. Taylor and Rodney Eatock Taylor
|

| Hydrodynamic Coefficients of Porous Plates and Application to Subsea Deployment F.-X. Sireta, K. Thiagarajan, B. Molin and F. Pistani
|

| Simplified Method for Prediction of Hydrodynamic Forces on Subsea Structures Lifted Through Wave Zone Tormod Bøe and Arne Nestegård
|

| Dynamic Amplification Factors in Lifting Operations for Installation of a Subsea Spool Mehrdad Kimiaei and Ali Reza Khosroshahli
|
Floatover Operations

| Kikeh Spar Topside Floatover Installation — Operational Aspects David N. Edelson, Daniel van Schooneveld, Jim Wang and Doug Smiley
|

| Mating Analysis of the Truss and Hull Sections on the Truss Semisubmesible in Open Water John Murray, Cheng-Yo Chen and Chan K. Yang
|

| Float-Over Technical Challenges Alp A. Kocaman and Daejun Kim
|

| Float-Over High Air Gap Jean-Marc Cholley and Marc Cahay
|

| Floatover – Installation of Topsides Rune Aalvik Lien, Helge Johnsgard, Kjetil Eckhoff and Jan Gramnas
|

| Vessel Adapted for Deck Structure Installation and Removal: New Solution Jean-Marc Cholley, Pierre Armand Thomas and Nicolas Tcherniguin
|

| Assembly of a Monocolumn Hull by the Mating of Two Sections Daniele Lima, Marta Tapia Reyes and Isaias Quaresma Masetti
|
Installation of Subsea Template

| Wet-Tow and Installation of Subsea Templates Kenneth Aarset, Tale Kristine Ulstein and Håvard Strand
|

| The Pencil Buoy System — Installation of Subsea Structures without Offshore Crane Vessel Trine Risoey, Helge Johnsgard, Henrik Mork and Jan Gramnas
|
Pipeline Installation

| Reducing the Cost of Offshore Pipelines Andrew C. Palmer, John Hammond and Roger A. King
|

| Analysis of an Alternative Pipeline Installation Procedure that Combines Onshore Deflection and Offshore Transportation Danilo Machado Lawinscky da Silva, Rodrigo Almeida Bahiense, Breno Pinheiro Jacob, Fernando Gomes da Silva Torres and Antonio Roberto Medeiros
|

| Design and Installation of Steel Transfer Lines for Deep Water Export Terminal Projects Hervé Quintin and Marin Abélanet
|
Installation and Control of Moorings and Risers

| Installation of Deep Water Moorings Frode Eidheim and Ian Frazer
|

| Design and Installation of Steel Catenary Risers in Deep to Ultra Deep Water Hervé Quitin and Marin Abélanet
|

| Deepwater Minimum Production Riser System, Design, Fabrication, Installation Jean-Francois Saint-Marcoux and Mason Wu
|

| Parametric Evaluations of the Buoy Supporting Riser (BSR) Installation Antonio C. Fernandes, Jairo B. Araújo, Marcos Rangel, Joel S. Sales Jr, José C. L. de Almeida, Ricardo Franciss and Jorge Merino
|

| Switching Control for Thruster-Assisted Position Mooring Dong T. Nguyen and Asgeir J. Sørensen
|

| Control of Marine Drilling Riser Angles by Position Mooring Dat H. Nguyen, Dong T. Nguyen, Ser T. Quek and Asgeir J. Sørensen
|
General Session

| Ampelmann Demonstrator: Completion of a Motion Compensation Platform for Offshore Access and Review of Different Applications J. van der Tempel, D. J. Cerda Salzmann, J. M. L. Koch, F. W. B. Gerner and A. J. Göbel
|

| Response Based Motion Analysis Methods for a Turret Moored FPSO Iwan Aryawan, Richard Bamford and Graham Stewart
|

| Weather Routing: Uncertainties and the Effect of Decision Support Systems A. B. Aalbers and C. J. G. van Dongen
|

| Design and Construction Considerations for Compliant Towers Offshore Borneo Peter Marshall and Carlos Llorente
|

| Transport and Installation of Shah-Deniz TPG500 in the Caspian Sea Pierre-Armand Thomas, Nicolas Tcherniguin and Jean-Marc Cholley
|
|